Initialising ...
Initialising ...
Initialising ...
Initialising ...
Initialising ...
Initialising ...
Initialising ...
Hamamoto, Shimpei; Tochio, Daisuke; Ishii, Toshiaki; Sawahata, Hiroaki
Nihon Genshiryoku Gakkai Wabun Rombunshi, 16(4), p.169 - 172, 2017/12
A melt wire was installed at the tip of the control rod in order to measure the temperature of High Temperature engineering Test Reactor (HTTR). After experience with reactor scrum from the state of reactor power 100%, the melt wire was taken out from the control rod and appearance has been observed visually. It was confirmed that the melt wires with a melting point of 505 C or less were melted, and the melt wires with a melting point of 651 C or more were not melted. Therefore, it was found that the highest arrival temperature of tip of the control rods where the melt wires are installed reaches within the range of 505 to 651 C. And it was found that the control rod temperature at the time of reactor scram does not exceed the using temperature criteria (900 C) of Alloy 800H of the control rod sleeve.
Hamamoto, Shimpei; Sawahata, Hiroaki; Suzuki, Hisashi; Ishii, Toshiaki; Yanagida, Yoshinori
no journal, ,
no abstracts in English